US Signal OR01 - Bend
US Signal OR01 - Bend is an operational data center operated by OneNeck IT Solutions in Bend, United States. Our footprint estimate of its power is about 4.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | OneNeck IT Solutions |
| Facility power | 4.7 MW (range 2.3 MW to 7.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,914 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks PeeringDB. |
| Also known as | US Signal - OR01 Bend |
| Address | 20845 Sockeye Pl |
| Coordinates | 44.08624, -121.28297 |
| Website | ussignal.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 18.2 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Redmond Substation, 230 kV, 21.3 km away |
| Utility | Bonneville Power Administration (federal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | BPAT |
| Nearest gas pipeline | Gas Transmission - Northwest, interstate pipeline, 4.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 222 MW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 7.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.8 °C (2001 to 2025) |
| Cooling degree days | 125 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.27 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does US Signal OR01 - Bend use?
We estimate the facility power at about 4.7 MW. Estimate from building footprint, low confidence.
How close is US Signal OR01 - Bend to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 18.2 km away. The local utility is Bonneville Power Administration, in the BPAT balancing area.
How clean is the power for US Signal OR01 - Bend?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates US Signal OR01 - Bend?
OneNeck IT Solutions.
Data centers near Bend
- BendTel 3.6 km
- Fort Rock Data Center 5.6 km · 0.9 MW
- Meta 39.0 km · 29 MW
- Meta 39.1 km · 52 MW
- Meta Prineville Data Center 39.4 km · 238 MW
- Meta 39.4 km · 86 MW
- Meta 39.4 km · 61 MW
- Apple 39.6 km · 0.8 MW
More OneNeck IT Solutions data centers
- US Signal CO01 - Denver United States
- US Signal AZ01 - Phoenix United States
- US Signal IA01 - Des Moines United States
- US Signal MN01 - Minneapolis United States
- US Signal WI02 - Madison United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.