France Travail datacenter Orléans is an operational data center operated by France Travail DSI in La Chapelle-Saint-Mesmin, France. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorFrance Travail DSI
Coordinates47.89304, 1.85215

Power and grid

Nearest high-voltage substationPoste électrique de Chaingy, 400 kV, 4.1 km away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km2.1 GW in 20 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature11.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.6 °C (2001 to 2025)
Cooling degree days164 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.31 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayLow (<10%) (Centre-Val de Loire)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is France Travail datacenter Orléans to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Chaingy (400 kV), about 4.1 km away.

How clean is the power for France Travail datacenter Orléans?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates France Travail datacenter Orléans?

France Travail DSI.

Data centers near La Chapelle-Saint-Mesmin

Sources

Correct this page or get the data