Scitis-Zen DataCenter Hitachi
Scitis-Zen DataCenter Hitachi is an operational data center in Ardon, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Address | Avenue de la Pomme de Pin 770, 45160, Ardon |
| Coordinates | 47.82375, 1.92014 |
Power and grid
| Nearest high-voltage substation | ST-CYR-EN-VAL, 225 kV, 3.4 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 2.1 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.6 °C (2001 to 2025) |
| Cooling degree days | 164 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.31 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low (<10%) (Centre-Val de Loire) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Scitis-Zen DataCenter Hitachi to the power grid?
The nearest high-voltage substation in OpenStreetMap is ST-CYR-EN-VAL (225 kV), about 3.4 km away.
How clean is the power for Scitis-Zen DataCenter Hitachi?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Data centers near Ardon
- LIFO 2.8 km
- France Travail datacenter Orléans 9.2 km
- Data center in Luisant 69.9 km
- Orange / Chartres 78.3 km
- Greenfield 78.4 km · 17 MW
- Greenfield 84.3 km · 20 MW
- Datacenter Groupama 91.1 km · 2.9 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.