Glesys Falkenberg 2
Glesys Falkenberg 2 is an operational data center operated by Glesys in Falkenberg, Sweden. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Glesys |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Address | Kanslistvägen 12 |
| Coordinates | 56.91606, 12.49799 |
| Website | glesys.com/locations/our-data-centers/falkenberg |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 1.8 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 29.7 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 2.5 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 36 g CO₂ per kWh (Sweden, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7% |
| Industrial power price | EUR 0.096 per kWh (Sweden, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.6 °C (2001 to 2025) |
| Cooling degree days | 33 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.69 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Low (<10%) (Halland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Glesys Falkenberg 2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 1.8 km away.
How clean is the power for Glesys Falkenberg 2?
The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.
Who operates Glesys Falkenberg 2?
Glesys.
Data centers near Falkenberg
- Glesys 294 m · 3.2 MW
More Glesys data centers
- Glesys Sweden
- Glesys Oulu 1 Finland
- Glesys Oulu 2 Finland
- Glesys Oulu 3 Finland
- Glesys Oulu Campus Finland
- Glesys Pori 1 Finland
- Glesys Stockholm 1 Sweden
- Glesys Tampere 1 Finland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.