Data Center Directory

Glesys

Glesys is an operational data center operated by Glesys in Falkenberg, Sweden. Our footprint estimate of its power is about 3.2 MW.

Key facts

StatusOperational
OperatorGlesys
Facility power3.2 MW (range 1.6 MW to 5.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,648 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates56.91472, 12.49383

Power and grid

Grid carbon intensity36 g CO₂ per kWh (Sweden, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7%
Industrial power priceEUR 0.096 per kWh (Sweden, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayLow (<10%) (Halland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Glesys use?

We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.

How clean is the power for Glesys?

The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.

Who operates Glesys?

Glesys.

Data centers near Falkenberg

More Glesys data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.