GNC-Alfa Yerevan
GNC-Alfa Yerevan is an operational data center operated by GNC-Alfa CJSC in Yerevan, Armenia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | GNC-Alfa CJSC |
| Networks | 1 networks PeeringDB. |
| Address | Tigran Mets 4 |
| Coordinates | 40.17612, 44.51361 |
| Website | gnc.am |
Power and grid
| Grid carbon intensity | 242 g CO₂ per kWh (Armenia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 39.1%, nuclear 31%, hydro 20%, solar 9.7%. Clean power: 60.7% |
Climate and water
| Average temperature | 13.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.9 °C (2001 to 2025) |
| Cooling degree days | 892 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.25 kWh per m² per day |
| Wind at 50 m | 3.4 m/s average |
| Water stress today | Medium - High (20-40%) (Armenia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for GNC-Alfa Yerevan?
The grid in Armenia emits about 242 g CO₂ per kWh (2025). Largest sources: gas 39.1%, nuclear 31%, hydro 20%.
Who operates GNC-Alfa Yerevan?
GNC-Alfa CJSC.
Data centers near Yerevan
- REG.AM 306 m
- Viva Argishti 973 m
- AIC 1.5 km
- Viva Kochar 3.0 km
- Viva Karekin_Njdeh 3.8 km
- Ovio 13.5 km · 1.6 MW
- Yotta Network LLC 16.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.