Ovio is an operational data center operated by GNC-Alfa in Աբովյան, Armenia. Our footprint estimate of its power is about 1.6 MW.

Key facts

StatusOperational
OperatorGNC-Alfa
Facility power1.6 MW (range 0.8 MW to 2.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,299 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 680 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressԿարմիր Բանակի փողոց 7, Աբովյան
Coordinates40.26963, 44.61480

Power and grid

Grid carbon intensity242 g CO₂ per kWh (Armenia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 39.1%, nuclear 31%, hydro 20%, solar 9.7%. Clean power: 60.7%

Climate and water

Water stress todayHigh (40-80%) (Kotayk)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Ovio use?

We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.

How clean is the power for Ovio?

The grid in Armenia emits about 242 g CO₂ per kWh (2025). Largest sources: gas 39.1%, nuclear 31%, hydro 20%.

Who operates Ovio?

GNC-Alfa.