Grade 1 classes
Grade 1 classes is an operational data center in Johannesburg, South Africa. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Also known as | Computer labs and server room |
| Coordinates | -26.15675, 28.02658 |
Power and grid
| Nearest high-voltage substation | Fordsburg Substation, 275 kV, 5.7 km away (Eskom) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 1.1 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 17.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 588 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.68 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Extremely High (>80%) (Gauteng) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Grade 1 classes to the power grid?
The nearest high-voltage substation in OpenStreetMap is Fordsburg Substation (275 kV), about 5.7 km away.
How clean is the power for Grade 1 classes?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Data centers near Johannesburg
- Parklands 1.5 km · 3.8 MW
- OADC - Parklands 1.6 km
- Rosebank Exchange 2.0 km · 1.7 MW
- Cool Ideas Victory Park Datacentre 2.4 km
- Reflex Solutions 2.7 km
- MTN Newlands 6.5 km · 2.2 MW
- Data center in Johannesburg 6.6 km · 1.4 MW
- NexAxis Randview Datacentre 8.6 km · 4.8 MW
Sources