NexAxis Randview Datacentre
NexAxis Randview Datacentre is an operational data center operated by NexAxis | Harlequin Duck Properties in Randburg, South Africa. Our footprint estimate of its power is about 4.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NexAxis | Harlequin Duck Properties |
| Facility power | 4.8 MW (range 2.4 MW to 7.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,968 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -26.09013, 27.98366 |
Power and grid
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 17.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 588 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.68 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Extremely High (>80%) (Gauteng) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NexAxis Randview Datacentre use?
We estimate the facility power at about 4.8 MW. Estimate from building footprint, low confidence.
How clean is the power for NexAxis Randview Datacentre?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Who operates NexAxis Randview Datacentre?
NexAxis | Harlequin Duck Properties.
Data centers near Randburg
- Cool Ideas Victory Park Datacentre 6.3 km
- Reflex Solutions 7.1 km
- OADC - Parklands 8.2 km
- Parklands 8.2 km · 3.8 MW
- Data center in Roodepoort 8.3 km · 7 MW
- Grade 1 classes 8.6 km
- Rosebank Exchange 8.7 km · 1.7 MW
- MTN data center in Sandton 9.3 km · 5.8 MW
Sources
Correct this page or get the data