MTN data center in Sandton

MTN data center in Sandton is an operational data center operated by MTN in Sandton, South Africa. Our footprint estimate of its power is about 5.8 MW.

Key facts

StatusOperational
OperatorMTN
Facility power5.8 MW (range 2.9 MW to 9.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,817 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-26.06603, 28.07315

Power and grid

Nearest high-voltage substationDelta Substation, 275 kV, 6.5 km away (City Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km3
Power plants within 50 km1.1 GW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity699 g CO₂ per kWh (South Africa, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9%

Climate and water

Average temperature17.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.8 °C (2001 to 2025)
Cooling degree days588 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.68 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayExtremely High (>80%) (Gauteng)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does MTN data center in Sandton use?

We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.

How close is MTN data center in Sandton to the power grid?

The nearest high-voltage substation in OpenStreetMap is Delta Substation (275 kV), about 6.5 km away.

How clean is the power for MTN data center in Sandton?

The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.

Who operates MTN data center in Sandton?

MTN.

Data centers near Sandton

More MTN data centers

Sources