Green Data - Nanterre
Green Data - Nanterre is an operational data center operated by GREEN DATA in Nanterre, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | GREEN DATA |
| Networks | 6 networks PeeringDB. |
| Address | 55 avenue des Champs Pierreux |
| Coordinates | 48.88728, 2.21451 |
| Website | greendata.fr |
Power and grid
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 106 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Green Data - Nanterre?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Green Data - Nanterre?
GREEN DATA.
Data centers near Nanterre
- Level (3) Le Capitole Nanterre 64 m
- Level(3) Paris (Le Capitole) 64 m
- moji1 799 m
- dc2scale Nanterre 1.3 km
- Orange data center in Rueil-Malmaison 2.0 km
- Groupe Cyllene - DC - Nanterre 2.1 km
- Completel Val de Reuil 2.1 km
- Bouygues Télécom data center in Nanterre 2.3 km · 1.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.