Level (3) Le Capitole Nanterre
Level (3) Le Capitole Nanterre is an operational data center operated by Lumen Technologies in Nanterre, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Address | Avenue des Champs Pierreux 55, 92000, Nanterre |
| Coordinates | 48.88783, 2.21424 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Boule, 225 kV, 800 m away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 43 |
| Power plants within 50 km | 2.1 GW in 51 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 106 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Level (3) Le Capitole Nanterre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Boule (225 kV), about 800 m away.
How clean is the power for Level (3) Le Capitole Nanterre?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Level (3) Le Capitole Nanterre?
Lumen Technologies.
Data centers near Nanterre
- Green Data - Nanterre 64 m
- Level(3) Paris (Le Capitole) 67 m
- moji1 862 m
- dc2scale Nanterre 1.2 km
- Orange data center in Rueil-Malmaison 2.0 km
- Groupe Cyllene - DC - Nanterre 2.0 km
- Completel Val de Reuil 2.2 km
- Bouygues Télécom data center in Nanterre 2.3 km · 1.8 MW
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) Denver United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.