GreenNode Bangkok Cluster
GreenNode Bangkok Cluster is an operational AI data center operated by VNG in Huamak, Thailand. Its power is about 1.5 MW. Epoch AI estimates about 1,024 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | VNG |
| Facility power | 1.5 MW Reported (Epoch AI or owner data) |
| AI compute | 1,024 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 1,024 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 620 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 1 Soi Ramkhamhaeng 28, Hua Mak, Khet Bang Kapi, Bangkok 10240, Thailand |
| Coordinates | 13.75200, 100.64038 |
Power and grid
| Grid carbon intensity | 526 g CO₂ per kWh (Thailand, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 61.5%, coal 16.7%, bioenergy 11%, solar 5%, hydro 3.9%. Clean power: 21.7% |
Climate and water
| Average temperature | 27.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43 °C (2001 to 2025) |
| Cooling degree days | 3,650 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.22 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (Thailand) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| GreenNode Bangkok Cluster | NVIDIA H100 SXM5 80GB | 1,024 | 1.5 MW | 2024-06-25 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does GreenNode Bangkok Cluster use?
Public data puts the facility power at about 1.5 MW. Reported (Epoch AI or owner data).
What chips does GreenNode Bangkok Cluster use?
Reported chips: NVIDIA H100 SXM5 80GB.
How clean is the power for GreenNode Bangkok Cluster?
The grid in Thailand emits about 526 g CO₂ per kWh (2025). Largest sources: gas 61.5%, coal 16.7%, bioenergy 11%.
Who operates GreenNode Bangkok Cluster?
VNG.
Data centers near Huamak
- STTGDC BKK2 1.0 km · 2.4 MW
- Arise IDC - Bangkok Central 2, Thailand 2.6 km
- STTGDC BKK1 2.9 km
- Telehouse – Bangkok 7.3 km · 1.1 MW
- Damac Digital Thailand (BKK01) 7.3 km · 4.9 MW
- CS LoxInfo Data Center - CW Tower 7.5 km
- Data center in Khan Na Yao 7.5 km · 0.6 MW
- Arise IDC - Bangkok Central 1, Thailand 7.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.