STTGDC BKK2
STTGDC BKK2 is an operational data center operated by STTGDC in Bangkok, Thailand. Our footprint estimate of its power is about 2.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | STTGDC |
| Facility power | 2.4 MW (range 1 MW to 6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 19,923 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks, 1 internet exchanges PeeringDB. |
| Also known as | ศูนย์ข้อมูล STT · ศูนย์ข้อมูล STT (BKK1) · ศูนย์ข้อมูล STT (BKK2) |
| Address | 1 Soi Ramkhamhaeng 28, Hua Mak, Khet Bang Kapi |
| Coordinates | 13.75729, 100.63244 |
| Website | sttgdc.com |
Power and grid
| Nearest high-voltage substation | สถานีไฟฟ้าแรงสูงบางกะปิ, 230 kV, 3.6 km away (การไฟฟ้าฝ่ายผลิตแห่งประเทศไทย) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 5.1 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 526 g CO₂ per kWh (Thailand, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 61.5%, coal 16.7%, bioenergy 11%, solar 5%, hydro 3.9%. Clean power: 21.7% |
Climate and water
| Average temperature | 27.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43 °C (2001 to 2025) |
| Cooling degree days | 3,650 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.22 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (Thailand) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does STTGDC BKK2 use?
We estimate the facility power at about 2.4 MW. Estimate from building footprint, low confidence.
How close is STTGDC BKK2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is สถานีไฟฟ้าแรงสูงบางกะปิ (230 kV), about 3.6 km away.
How clean is the power for STTGDC BKK2?
The grid in Thailand emits about 526 g CO₂ per kWh (2025). Largest sources: gas 61.5%, coal 16.7%, bioenergy 11%.
Who operates STTGDC BKK2?
STTGDC.
Data centers near Bangkok
- GreenNode Bangkok Cluster 1.0 km · 1.5 MW
- STTGDC BKK1 2.0 km
- Arise IDC - Bangkok Central 2, Thailand 2.6 km
- Telehouse – Bangkok 6.4 km · 1.1 MW
- Damac Digital Thailand (BKK01) 6.4 km · 4.9 MW
- CS LoxInfo Data Center - CW Tower 6.5 km
- Arise IDC - Bangkok Central 1, Thailand 6.8 km
- Data center in Khan Na Yao 7.1 km · 0.6 MW
More STTGDC data centers
- STTGDC SIN4 Singapore
- STTGDC SIN5 Singapore
- STTGDC SIN1 Singapore
- STTGDC SIN6 Singapore
- STTGDC KUL1 Malaysia
- STTGDC BKK1 Thailand
- STTGDC BKK3 Thailand
- STTGDC BLR1 India
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.