Grupo IDDEA is an operational data center in Guadalajara, Mexico. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
Facility power13 MW (range 6.5 MW to 21 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,825 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates20.63743, -103.37073

Power and grid

Nearest high-voltage substationColón, 230 kV, 2.7 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km9
Power plants within 50 km1.2 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity481 g CO₂ per kWh (Mexico, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2%

Climate and water

Average temperature20 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.5 °C (2001 to 2025)
Cooling degree days987 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.9 kWh per m² per day
Wind at 50 m3.1 m/s average
Water stress todayExtremely High (>80%) (Jalisco)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Grupo IDDEA use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is Grupo IDDEA to the power grid?

The nearest high-voltage substation in OpenStreetMap is Colón (230 kV), about 2.7 km away.

How clean is the power for Grupo IDDEA?

The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.