Megacable Data Center - Guadalajara
Megacable Data Center - Guadalajara is an operational data center operated by Mega Cable, S.A. de C.V. in Guadalajara, Mexico. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Mega Cable, S.A. de C.V. |
| Networks | 7 networks PeeringDB. |
| Address | Calle Jose Mariano Abasolo 1571, Cerro del Jagüey |
| Coordinates | 20.61208, -103.28182 |
| Website | megacabledatacenter.com |
Power and grid
| Nearest high-voltage substation | San Martín, 230 kV, 1.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 1.2 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 481 g CO₂ per kWh (Mexico, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2% |
Climate and water
| Average temperature | 20 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.5 °C (2001 to 2025) |
| Cooling degree days | 987 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.9 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Extremely High (>80%) (Jalisco) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Megacable Data Center - Guadalajara to the power grid?
The nearest high-voltage substation in OpenStreetMap is San Martín (230 kV), about 1.1 km away.
How clean is the power for Megacable Data Center - Guadalajara?
The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.
Who operates Megacable Data Center - Guadalajara?
Mega Cable, S.A. de C.V..
Data centers near Guadalajara
- ATC Edge GDL/E1 5.4 km
- Grupo IDDEA 9.7 km · 13 MW
- HostDime GDL Mexico Data Center 13.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.