Data Center Directory

Hetzner data center - HEL1

Hetzner data center - HEL1 is a data center under construction operated by Hetzner Finland in Asola, Finland. Our footprint estimate of its power is about 18 MW.

Key facts

StatusUnder construction
OperatorHetzner Finland
Facility power18 MW (range 7.2 MW to 45 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 149,089 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 7,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates60.34225, 25.03122

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 200 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 400 kV, 6.8 km away
HV substations within 10 km20
Power plants within 50 km1.6 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity59 g CO₂ per kWh (Finland, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2%
Industrial power priceEUR 0.076 per kWh (Finland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature5.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.1 °C (2001 to 2025)
Cooling degree days36 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.57 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayLow (<10%) (Finland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Hetzner data center - HEL1 use?

We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.

How close is Hetzner data center - HEL1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 200 m away.

How clean is the power for Hetzner data center - HEL1?

The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.

Who operates Hetzner data center - HEL1?

Hetzner Finland.

Data centers near Asola

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.