Telia Helsinki Datacenter
Telia Helsinki Datacenter is an operational data center operated by Telia in Helsinki, Finland. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Telia |
| Facility power | 14 MW (range 7 MW to 22 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,591 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 26 networks, 4 internet exchanges PeeringDB. |
| Also known as | Telia HDC |
| Address | Valimotie 5 |
| Coordinates | 60.21593, 24.87771 |
| Website | telia.fi/business/telia-helsinki-data-center |
Power and grid
| Grid carbon intensity | 59 g CO₂ per kWh (Finland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2% |
| Industrial power price | EUR 0.076 per kWh (Finland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 6.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 27.9 °C (2001 to 2025) |
| Cooling degree days | 35 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.57 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low (<10%) (Finland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telia Helsinki Datacenter use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How clean is the power for Telia Helsinki Datacenter?
The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.
Who operates Telia Helsinki Datacenter?
Telia.
Data centers near Helsinki
- Creanova Datacenter 287 m
- Mediam Helsinki Datacenter 623 m
- Digita Helsinki Pasila Broadcasting Tower 2.8 km
- Elisa Espoo Säterinportti 3.7 km
- Elisa Helsinki Pasila 3.9 km
- atNorth FIN01 4.3 km
- IP-Only Espoo 4.9 km
- Innopoli 5.0 km
More Telia data centers
- Telia data center in Vilnius Lithuania
- Telia Stockholm STK2 Sweden
- Telia Telehouse KJJ Estonia
- Telia Telehouse MUS Estonia
Sources
Correct this page or get the data