Telia Telehouse KJJ
Telia Telehouse KJJ is an operational data center operated by Telia in Tallinn, Estonia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Telia |
| Networks | 28 networks, 6 internet exchanges PeeringDB. |
| Address | Sõle 14D |
| Coordinates | 59.43518, 24.71494 |
| Website | telia.ee/ari/it-teenused/serverid-ja-pilv/seadmemajutus |
Power and grid
| Nearest high-voltage substation | Endla alajaam, 110 kV, 1.2 km away (Elering;Elektrilevi) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Harku alajaam, 330 kV, 10.5 km away |
| HV substations within 10 km | 17 |
| Power plants within 50 km | 503 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 319 g CO₂ per kWh (Estonia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | oil and other fossil 38.9%, bioenergy 21.8%, solar 18.9%, wind 18.6%, gas 1.3%. Clean power: 59.8% |
| Industrial power price | EUR 0.123 per kWh (Estonia, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 6.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 28.1 °C (2001 to 2025) |
| Cooling degree days | 42 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.71 kWh per m² per day |
| Wind at 50 m | 7.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Estonia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Telia Telehouse KJJ to the power grid?
The nearest high-voltage substation in OpenStreetMap is Endla alajaam (110 kV), about 1.2 km away.
How clean is the power for Telia Telehouse KJJ?
The grid in Estonia emits about 319 g CO₂ per kWh (2025). Largest sources: oil and other fossil 38.9%, bioenergy 21.8%, solar 18.9%.
Who operates Telia Telehouse KJJ?
Telia.
Data centers near Tallinn
- CITIC Telecom CPC Datacenter Tallinn 397 m
- WaveCom DC 1.1 km
- INFONET DC 2.7 km
- Telia Telehouse MUS 3.9 km
- GDC Tallinn DC-1 10.2 km
- Greenergy Data Centers data center in Hüüru küla 10.2 km · 3.8 MW
- Tallinn TV Tower 10.5 km
More Telia data centers
- Telia Helsinki Datacenter Finland
- Telia data center in Vilnius Lithuania
- Telia Stockholm STK2 Sweden
- Telia Telehouse MUS Estonia