Data Center Directory

Huawei Wuhu

Huawei Wuhu is an operational data center that is still expanding, operated by Huawei in Wuhu, China. Its power is about 256 MW, growing to about 589 MW by 2027-12. Epoch AI estimates about 53,000 H100-equivalent AI chips (Ascend 910C, H20, Ascend 910B, Ascend 950PR).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorHuawei
Facility power256 MW
Reported (Epoch AI or owner data)
IT power197 MW
Planned power589 MW by 2027-12-01
Epoch AI timeline projection.
AI compute53,000 H100-equivalents → 151,000 planned
AI chipsAscend 910C, H20, Ascend 910B, Ascend 950PR
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 110,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 7.5 billion → 17.2 billion planned
Epoch AI estimate, 2025 USD.
AddressWuhu, China
Coordinates31.18006, 118.21418

Build timeline

DatePowerH100eWhat the satellite images and filings show
2022-12-0100Land clearing begins, with the east campus being the first of the three. Land clearing begins for the other two campuses months after.
2025-01-0157 MW7,545The first building is operational. On the north campus, building 4 is operational assuming a 3-month fit-out post structural completion. We multiply each building's estimated capacity by an assumed 65% rack occupancy rate. This is close to the ~62–64% reported for Wuhu and other national data center hubs in 2023, and matches Anhui's 65% target for the Wuhu cluster. Occupied capacity is assumed to be all AI chips.
2025-03-01153 MW20,000Three buildings are operational. On the west campus, building 1 is operational, and on the east campus, building 7 is operational. The second building on the east campus has installed generators, but as of 2026 does not have the cooling sufficient for AI. Assumes a 3-month fit-out post structural completion. As with the other buildings, we assume 65% rack occupancy.
2025-11-01202 MW36,000Four buildings are operational. On the west campus, building 2 is operational assuming a 3-month fit-out post structural completion. As with the other buildings, we assume 65% rack occupancy.
2026-01-24202 MW36,000Four buildings are operational in total. A fifth building, building 5 on the north campus, is finishing installing roofside cooling. Another building on the east campus is complete but does not have sufficient cooling for AI despite its backup generators. The remaining three buildings, one per campus, have not begun construction.
2026-06-01202 MW36,000Four buildings are operational. On the north campus, building 5 is nearing structural completion but still has roofing and cooling remaining.
2026-08-06202 MW36,000On the north campus, building 5 is structurally complete but not operational as seen by barricades and no parked cars. Building 6, a much larger building across the pond, should finish construction in approximately one month, given that it is structurally complete and 75% of its cooling looks to be installed. On the east campus, building 9 is under construction.
2026-11-01256 MW53,000Five buildings are operational. On the north campus, building 5 is operational assuming a 3-month fit-out post structural completion. As with the other buildings, we assume 65% rack occupancy.
2026-12-31 (projected)468 MW119,000Six buildings are operational. On the north campus, building 6, the larger building, is operational assuming a 3-month fit-out if it is structurally complete in September. We assume Building 6 is about 3.7x more power than one of the previous buildings, based on the size and quantity of cooling and backup generator equipment observed in satellite imagery. As with the other buildings, we assume 65% rack occupancy.
2027-12-01 (projected)589 MW151,000All eight AI buildings are operational. Buildings 3 and 9 are assumed to be 1.25x the power and compute of buildings 1 and 7 based on the sizing of the backup generator enclosures; building 8 is excluded due to insufficient cooling. The time from observed land-clearing to operational is 23-26 months based on previous buildings. As with the other buildings, we assume 65% rack occupancy.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-01-01Ascend 910C1,362Estimate
2025-01-01H2029,675Estimate
2025-01-01Ascend 910B10,900Estimate
2025-03-01Ascend 910C3,354Estimate
2025-03-01H2081,356Estimate
2025-03-01Ascend 910B26,832Estimate
2025-11-01Ascend 910C22,625Estimate
2025-11-01Ascend 910B33,256Estimate
2025-11-01H2083,555Estimate
2026-11-01Ascend 950PR33,085Estimate
2026-11-01Ascend 910C22,759Estimate
2026-12-31Ascend 910C23,291Estimate
2026-12-31Ascend 950PR164,147Estimate
2027-12-01Ascend 950PR201,438Estimate
2027-12-01Ascend 950DT25,955Estimate

Satellite view

Questions

How much power does Huawei Wuhu use?

Public data puts the facility power at about 256 MW, with about 589 MW planned by 2027. Reported (Epoch AI or owner data).

What chips does Huawei Wuhu use?

Reported chips: Ascend 910C, H20, Ascend 910B, Ascend 950PR.

Who operates Huawei Wuhu?

Huawei.

Data centers near Wuhu

More Huawei data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.