Data Center Directory

Hyperscale Data Center

Hyperscale Data Center is an operational data center in Dowagiac, United States. Our footprint estimate of its power is about 15 MW.

Key facts

StatusOperational
Facility power15 MW (range 5.9 MW to 37 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 122,867 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 6,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.99322, -86.09817

Power and grid

UtilityCity Of Dowagiac
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineANR Pipeline Co, interstate pipeline, 4.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity455 g CO₂ per kWh (Michigan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 42%, coal 23.2%, nuclear 21.7%, wind 8%, solar 2.6%. Clean power: 34.5%
Industrial power priceUSD 0.090 per kWh (Michigan, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayLow - Medium (10-20%) (Michigan)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Hyperscale Data Center use?

We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.

How clean is the power for Hyperscale Data Center?

The grid in Michigan emits about 455 g CO₂ per kWh (2025). Largest sources: gas 42%, coal 23.2%, nuclear 21.7%.

Data centers near Dowagiac

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.