Hyperscale Data Center
Hyperscale Data Center is an operational data center in Dowagiac, United States. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 15 MW (range 5.9 MW to 37 MW) Estimate from building footprint, low confidence. Footprint estimate: about 122,867 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.99322, -86.09817 |
Power and grid
| Utility | City Of Dowagiac Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 4.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 455 g CO₂ per kWh (Michigan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 42%, coal 23.2%, nuclear 21.7%, wind 8%, solar 2.6%. Clean power: 34.5% |
| Industrial power price | USD 0.090 per kWh (Michigan, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Michigan) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Hyperscale Data Center use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
How clean is the power for Hyperscale Data Center?
The grid in Michigan emits about 455 g CO₂ per kWh (2025). Largest sources: gas 42%, coal 23.2%, nuclear 21.7%.
Data centers near Dowagiac
- Midwest Energy & Communications 13.2 km
- Microsoft Granger Data Center 29.4 km · 138 MW
- Microsoft Granger Data Center 30.6 km · 257 MW
- GAP Union Station 38.3 km
- Aunalytics South Bend Datacenter (AUSB) 39.2 km
- Aunalytics Kalamazoo Datacenter 44.8 km
- Data center in South Bend 45.1 km · 19 MW
- Data center in South Bend 45.3 km · 19 MW
Sources