Microsoft Granger Data Center
Microsoft Granger Data Center is an operational data center in Granger, United States. Our footprint estimate of its power is about 257 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 257 MW (range 103 MW to 641 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,138,294 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 110,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.71897, -86.12482 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Granger Data Center use?
We estimate the facility power at about 257 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Granger Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Data centers near Granger
- Microsoft Granger Data Center 1.2 km · 138 MW
- Data center in South Bend 28.3 km · 19 MW
- Data center in South Bend 28.6 km · 19 MW
- Project Ranier AWS Data Center 28.7 km · 97 MW
- Data center in South Bend 29.0 km · 19 MW
- Data center in South Bend 29.3 km · 19 MW
- Amazon AWS Data Center 29.5 km · 118 MW
- Hyperscale Data Center 30.6 km · 15 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.