ILA/Regeneration site PoP-Dodewaard
ILA/Regeneration site PoP-Dodewaard is an operational data center operated by Relined Fiber Network in Dodewaard, Netherlands. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Relined Fiber Network |
| Address | De Zandvoort 1 |
| Coordinates | 51.92705, 5.66586 |
| Website | relined.eu/en/ilasites |
Power and grid
| Nearest high-voltage substation | 380 kV Dodewaard, 380 kV, 100 m away (TenneT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 2.0 GW in 105 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.4 °C (2001 to 2025) |
| Cooling degree days | 72 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Low (<10%) (Gelderland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is ILA/Regeneration site PoP-Dodewaard to the power grid?
The nearest high-voltage substation in OpenStreetMap is 380 kV Dodewaard (380 kV), about 100 m away.
How clean is the power for ILA/Regeneration site PoP-Dodewaard?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates ILA/Regeneration site PoP-Dodewaard?
Relined Fiber Network.
Data centers near Dodewaard
- Microsoft Azure Pioneer-WEU 6.2 km · 1.1 MW
- BIT-2 11.5 km · 0.6 MW
- BIT-1 11.9 km
- Tuxis 12.3 km
- Datacenter Arnhem KLW 19.5 km
- Eurofiber Datacenter Arnhem 1 19.5 km
- Eurofiber data center Arnhem 1 19.5 km
- Cellnex 31.1 km
More Relined Fiber Network data centers
- ILA/Regeneration site PoP-Doetinchem Netherlands
- ILA/Regeneration site PoP-Eemshaven Netherlands
- ILA/Regeneration site PoP-Ens Netherlands
- ILA/Regeneration site PoP-Fanø Denmark
- ILA/Regeneration site PoP-Krimpen aan den IJssel Netherlands
- ILA/Regeneration site PoP-Maasbracht Netherlands
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.