Microsoft Azure Pioneer-WEU

Microsoft Azure Pioneer-WEU is an operational AI data center operated by Microsoft in Wageningen, Netherlands. Its power is about 1.1 MW. Epoch AI estimates about 414 H100-equivalent AI chips (NVIDIA A100).

Key facts

StatusOperational
OperatorMicrosoft
Facility power1.1 MW
Reported (Epoch AI or owner data)
AI compute414 H100-equivalents
AI chipsNVIDIA A100
Reported (Epoch AI or owner data)
Chip count1,312
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 480 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressNetherlands
Coordinates51.97247, 5.61349

Power and grid

Nearest high-voltage substation150 kV Wageningselaan, 150 kV, 4.5 km away (TenneT)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation380 kV Dodewaard, 380 kV, 6.1 km away
HV substations within 10 km6
Power plants within 50 km2.2 GW in 104 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity254 g CO₂ per kWh (Netherlands, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2%
Industrial power priceEUR 0.139 per kWh (Netherlands, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.4 °C (2001 to 2025)
Cooling degree days72 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.97 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayLow (<10%) (Utrecht)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Microsoft Azure Pioneer-WEUNVIDIA A1001,3121.1 MW2021-06-01

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Microsoft Azure Pioneer-WEU use?

Public data puts the facility power at about 1.1 MW. Reported (Epoch AI or owner data).

What chips does Microsoft Azure Pioneer-WEU use?

Reported chips: NVIDIA A100.

How close is Microsoft Azure Pioneer-WEU to the power grid?

The nearest high-voltage substation in OpenStreetMap is 150 kV Wageningselaan (150 kV), about 4.5 km away.

How clean is the power for Microsoft Azure Pioneer-WEU?

The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.

Who operates Microsoft Azure Pioneer-WEU?

Microsoft.

Data centers near Wageningen

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.