Data Center Directory

Internexa Medellin Colombia

Internexa Medellin Colombia is an operational data center operated by InterNexa in Medellin, Colombia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorInterNexa
Networks8 networks
PeeringDB.
AddressCalle 12 Sur # 18-168
Coordinates6.18819, -75.55860
Websiteinternexa.com

Power and grid

Nearest high-voltage substationSubestación Poblado, 110 kV, 1.8 km away (EPM)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationGuayabal, 220 kV, 3.3 km away
HV substations within 10 km13
Power plants within 50 km372 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity185 g CO₂ per kWh (Colombia, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1%

Climate and water

Average temperature17.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature29.1 °C (2001 to 2025)
Cooling degree days122 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.93 kWh per m² per day
Wind at 50 m1.5 m/s average
Water stress todayLow (<10%) (Antioquia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is Internexa Medellin Colombia to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación Poblado (110 kV), about 1.8 km away.

How clean is the power for Internexa Medellin Colombia?

The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.

Who operates Internexa Medellin Colombia?

InterNexa.

Data centers near Medellin

More InterNexa data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.