Internexa Cartagena Chambacu is an operational data center operated by InterNexa in Cartagena, Colombia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorInterNexa
Networks3 networks
PeeringDB.
AddressEdificio Inteligente Chambacu of 207, Cra 13 B # 26-78
Coordinates10.41674, -75.54169
Websiteinternexa.com

Power and grid

Nearest high-voltage substationEl Bosque, 220 kV, 2.3 km away (Electricaribe)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km600 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity185 g CO₂ per kWh (Colombia, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1%

Climate and water

Average temperature28.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.9 °C (2001 to 2025)
Cooling degree days3,689 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.31 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow (<10%) (Colombia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is Internexa Cartagena Chambacu to the power grid?

The nearest high-voltage substation in OpenStreetMap is El Bosque (220 kV), about 2.3 km away.

How clean is the power for Internexa Cartagena Chambacu?

The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.

Who operates Internexa Cartagena Chambacu?

InterNexa.

Data centers near Cartagena

More InterNexa data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.