TELECOM is an operational data center in El Carmen de Bolívar, Colombia. Our footprint estimate of its power is about 0.9 MW.

Key facts

StatusOperational
Facility power0.9 MW (range 0.4 MW to 1.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 724 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates9.71563, -75.12202

Power and grid

Nearest high-voltage substationSubestación El Carmen de Bolívar, 110 kV, 1.4 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Grid carbon intensity185 g CO₂ per kWh (Colombia, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1%

Climate and water

Average temperature28.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.2 °C (2001 to 2025)
Cooling degree days4,042 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.45 kWh per m² per day
Wind at 50 m2.7 m/s average
Water stress todayLow (<10%) (Colombia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does TELECOM use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.

How close is TELECOM to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación El Carmen de Bolívar (110 kV), about 1.4 km away.

How clean is the power for TELECOM?

The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.