Data Center Directory

INTRED-DC-TAMBURINI

INTRED-DC-TAMBURINI is an operational data center operated by Intred in Brescia, Italy. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorIntred
Addressvia Pietro Tamburini nr. 3
Coordinates45.57760, 10.23051
Websiteintred.it

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 1.3 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCabina Primaria di Nave, 380 kV, 2.6 km away
HV substations within 10 km37
Power plants within 50 km853 MW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity285 g CO₂ per kWh (Italy, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7%
Industrial power priceEUR 0.173 per kWh (Italy, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature13.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40 °C (2001 to 2025)
Cooling degree days576 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.78 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayHigh (40-80%) (Italy)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is INTRED-DC-TAMBURINI to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 1.3 km away.

How clean is the power for INTRED-DC-TAMBURINI?

The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.

Who operates INTRED-DC-TAMBURINI?

Intred.

Data centers near Brescia

More Intred data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.