Fastweb NeXXt AI Factory
Fastweb NeXXt AI Factory is an operational AI data center operated by Fastweb in Ponte San Pietro, Italy. Its power is about 0.4 MW. Epoch AI estimates about 248 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | Fastweb |
| Facility power | 0.4 MW Reported (Epoch AI or owner data) |
| AI compute | 248 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 248 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 150 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Via di San Clemente, 53 24036 Ponte San Pietro Bergamo, Italy |
| Coordinates | 45.70685, 9.59038 |
Power and grid
| Nearest high-voltage substation | Locate, 132 kV, 2.3 km away (Enel Distribuzione) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | UT Dalmine Tenaris, 220 kV, 7.9 km away |
| HV substations within 10 km | 23 |
| Power plants within 50 km | 3.3 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.5 °C (2001 to 2025) |
| Cooling degree days | 503 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | High (40-80%) (Italy) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Fastweb NeXXt AI Factory | NVIDIA H100 SXM5 80GB | 248 | 0.4 MW | 2024-07-09 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Fastweb NeXXt AI Factory use?
Public data puts the facility power at about 0.4 MW. Reported (Epoch AI or owner data).
What chips does Fastweb NeXXt AI Factory use?
Reported chips: NVIDIA H100 SXM5 80GB.
How close is Fastweb NeXXt AI Factory to the power grid?
The nearest high-voltage substation in OpenStreetMap is Locate (132 kV), about 2.3 km away.
How clean is the power for Fastweb NeXXt AI Factory?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Fastweb NeXXt AI Factory?
Fastweb.
Data centers near Ponte San Pietro
- Aruba IT3 - Milan PSP 52 m
- Planetel 4.7 km
- Promo.iT Srl 13.2 km
- Telecom Italia Sparkle Milano Data Center 29.8 km
- Equinix ML4 - Milan, Cascia 34.6 km
- Microsoft data center in Paullo 34.7 km · 8.6 MW
- MOMIT Milan 38.4 km
- TWT Datacenter 39.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.