Microsoft data center in Paullo
Microsoft data center in Paullo is an operational data center operated by Microsoft in Paullo, Italy. Our footprint estimate of its power is about 8.6 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 8.6 MW (range 4.3 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,136 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 3,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft |
| Coordinates | 45.42909, 9.38617 |
Power and grid
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.5 °C (2001 to 2025) |
| Cooling degree days | 503 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | High (40-80%) (Italy) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft data center in Paullo use?
We estimate the facility power at about 8.6 MW. Estimate from building footprint, low confidence.
What chips does Microsoft data center in Paullo use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft data center in Paullo?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Microsoft data center in Paullo?
Microsoft.
Data centers near Paullo
- Telecom Italia Sparkle Milano Data Center 8.8 km
- Data center in San Donato Milanese 10.1 km
- Data center in Melegnano 10.3 km · 13 MW
- MOMIT Milan 11.8 km
- Equinix ML4 - Milan, Cascia 14.4 km
- WIIT Milano 16.0 km
- TWT Datacenter 17.8 km
- Vaultica Data Centers | MIL01 17.8 km · 12 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data