Data center in Melegnano
Data center in Melegnano is an operational data center in Melegnano, Italy. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 13 MW (range 6.5 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,842 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 45.35366, 9.30992 |
Power and grid
| Nearest high-voltage substation | Melegnano, 132 kV, 1.2 km away (Enel Distribuzione) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Tavazzano Ovest, 220 kV, 7.9 km away |
| HV substations within 10 km | 16 |
| Power plants within 50 km | 8.8 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.5 °C (2001 to 2025) |
| Cooling degree days | 503 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | High (40-80%) (Italy) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Melegnano use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is Data center in Melegnano to the power grid?
The nearest high-voltage substation in OpenStreetMap is Melegnano (132 kV), about 1.2 km away.
How clean is the power for Data center in Melegnano?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Data centers near Melegnano
- Vaultica Data Centers | MIL01 8.5 km · 12 MW
- STACK MILL1B 8.7 km · 12 MW
- Data center in San Donato Milanese 8.7 km
- STACK MILL2 8.8 km · 8.4 MW
- Data center in Siziano 8.9 km
- Microsoft data center in Paullo 10.3 km · 8.6 MW
- Equinix ML3 - Milan, Basiglio 12.7 km · 2.1 MW
- MOMIT Milan 13.2 km