Equinix ML3 - Milan, Basiglio is an operational data center operated by Equinix in Milan, Italy. Our footprint estimate of its power is about 2.1 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power2.1 MW (range 1 MW to 3.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,720 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks8 networks, 1 internet exchanges
PeeringDB.
Also known asEquinix Milan ML3
AddressVia Francesco Sforza 13, Basiglio
Coordinates45.35407, 9.14732
Websiteequinix.com/locations/europe-colocation/italy-colocation/milan-data-centers/ml3

Power and grid

Nearest high-voltage substationLacchiarella CP, 132 kV, 1.5 km away (Enel Distribuzione)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationLacchiarella, 380 kV, 1.6 km away
HV substations within 10 km16
Power plants within 50 km7.9 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity285 g CO₂ per kWh (Italy, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7%
Industrial power priceEUR 0.173 per kWh (Italy, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature13.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.2 °C (2001 to 2025)
Cooling degree days482 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.78 kWh per m² per day
Wind at 50 m3 m/s average
Water stress todayHigh (40-80%) (Italy)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix ML3 - Milan, Basiglio use?

We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.

How close is Equinix ML3 - Milan, Basiglio to the power grid?

The nearest high-voltage substation in OpenStreetMap is Lacchiarella CP (132 kV), about 1.5 km away.

How clean is the power for Equinix ML3 - Milan, Basiglio?

The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.

Who operates Equinix ML3 - Milan, Basiglio?

Equinix.

Data centers near Milan

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.