IP-Only data center in Linköping
IP-Only data center in Linköping is an operational data center operated by IP-Only in Linköping, Sweden. Our footprint estimate of its power is about 5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | IP-Only |
| Facility power | 5 MW (range 2.5 MW to 7.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,065 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 58.39792, 15.55473 |
Power and grid
| Grid carbon intensity | 36 g CO₂ per kWh (Sweden, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7% |
| Industrial power price | EUR 0.096 per kWh (Sweden, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.9 °C (2001 to 2025) |
| Cooling degree days | 65 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low (<10%) (Sweden) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does IP-Only data center in Linköping use?
We estimate the facility power at about 5 MW. Estimate from building footprint, low confidence.
How clean is the power for IP-Only data center in Linköping?
The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.
Who operates IP-Only data center in Linköping?
IP-Only.
Data centers near Linköping
- NSC Berzelius 547 m · 0.6 MW
- AWS eu-north-1 Availability Zone K 77.3 km · 24 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.