Data Center Directory

AWS eu-north-1 Availability Zone K

AWS eu-north-1 Availability Zone K is an operational data center operated by Amazon Web Services in Katrineholm, Sweden. Our footprint estimate of its power is about 24 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusOperational
OperatorAmazon Web Services
Facility power24 MW (range 12 MW to 39 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 20,178 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 10,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates58.99642, 16.23517

Power and grid

Nearest high-voltage substationHedenlunda, 400 kV, 19.7 km away (Vattenfall Eldistribution)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km14 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity36 g CO₂ per kWh (Sweden, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7%
Industrial power priceEUR 0.096 per kWh (Sweden, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature6.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.8 °C (2001 to 2025)
Cooling degree days66 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.71 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayLow (<10%) (Sweden)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does AWS eu-north-1 Availability Zone K use?

We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.

What chips does AWS eu-north-1 Availability Zone K use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How close is AWS eu-north-1 Availability Zone K to the power grid?

The nearest high-voltage substation in OpenStreetMap is Hedenlunda (400 kV), about 19.7 km away.

How clean is the power for AWS eu-north-1 Availability Zone K?

The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.

Who operates AWS eu-north-1 Availability Zone K?

Amazon Web Services.

Data centers near Katrineholm

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.