AWS eu-north-1 Availability Zone E
AWS eu-north-1 Availability Zone E is an operational data center operated by Amazon Web Services in Eskilstuna, Sweden. Our footprint estimate of its power is about 15 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 15 MW (range 7.3 MW to 23 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,195 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 59.35838, 16.69180 |
Power and grid
| Nearest high-voltage substation | Kjula, 130 kV, 2.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 27 km away |
| HV substations within 10 km | 2 |
| Power plants within 50 km | 30 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 36 g CO₂ per kWh (Sweden, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7% |
| Industrial power price | EUR 0.096 per kWh (Sweden, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 6.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.4 °C (2001 to 2025) |
| Cooling degree days | 66 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.71 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Sweden) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AWS eu-north-1 Availability Zone E use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
What chips does AWS eu-north-1 Availability Zone E use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How close is AWS eu-north-1 Availability Zone E to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kjula (130 kV), about 2.3 km away.
How clean is the power for AWS eu-north-1 Availability Zone E?
The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.
Who operates AWS eu-north-1 Availability Zone E?
Amazon Web Services.
Data centers near Eskilstuna
- AWS eu-north-1 Availability Zone V 33.0 km · 33 MW
- AWS eu-north-1 Availability Zone K 47.9 km · 24 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
Sources
Correct this page or get the data