KAGOYA データセンター B棟 is an operational data center operated by カゴヤ・ジャパン株式会社 in Sugai, Japan. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | カゴヤ・ジャパン株式会社 |
| Facility power | 1.5 MW (range 0.8 MW to 2.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,265 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | KAGOYA データセンター A棟 |
| Coordinates | 34.74821, 135.78465 |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Water stress today | Low - Medium (10-20%) (Kyoto) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does KAGOYA データセンター B棟 use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
How clean is the power for KAGOYA データセンター B棟?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates KAGOYA データセンター B棟?
カゴヤ・ジャパン株式会社.
Data centers near Sugai
- 京阪奈データセンター 1.8 km · 8.8 MW
- Colt 京阪奈データセンター 1.8 km · 57 MW
- NTT 2.0 km
- NTT 20.8 km
- KDDI data center in Osaka 23.7 km
- NTT 23.8 km
- Digital Edge OSA1 - Osaka 24.0 km
- NTT Kitahama Data Center(Dojima Campus) 24.8 km