Colt 京阪奈データセンター is an operational data center operated by Colt data centre services in Sugai, Japan. Our footprint estimate of its power is about 57 MW.

Key facts

StatusOperational
OperatorColt data centre services
Facility power57 MW (range 29 MW to 92 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,571 m² building outline x 5 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 24,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates34.74663, 135.76465

Power and grid

Grid carbon intensity474 g CO₂ per kWh (Japan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33%

Climate and water

Water stress todayLow - Medium (10-20%) (Kyoto)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Colt 京阪奈データセンター use?

We estimate the facility power at about 57 MW. Estimate from building footprint, low confidence.

How clean is the power for Colt 京阪奈データセンター?

The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.

Who operates Colt 京阪奈データセンター?

Colt data centre services.

Data centers near Sugai

More Colt data centre services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.