Colt London 4
Colt London 4 is an operational data center operated by Colt Data Centre Services in Southall, United Kingdom. Our footprint estimate of its power is about 7.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Colt Data Centre Services |
| Facility power | 7.1 MW (range 3.6 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,950 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.50956, -0.39409 |
Power and grid
| Nearest high-voltage substation | North Hyde Substation, 275 kV, 1.6 km away (National Grid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 11 |
| Power plants within 50 km | 2.7 GW in 90 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Colt London 4 use?
We estimate the facility power at about 7.1 MW. Estimate from building footprint, low confidence.
How close is Colt London 4 to the power grid?
The nearest high-voltage substation in OpenStreetMap is North Hyde Substation (275 kV), about 1.6 km away.
How clean is the power for Colt London 4?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Colt London 4?
Colt Data Centre Services.
Data centers near Southall
- Data center in Hayes 1.4 km · 5.1 MW
- VIRTUS LONDON2 1.6 km · 8.6 MW
- UBS Data Centre 2.3 km · 12 MW
- Rackspace London 8 2.6 km · 4.9 MW
- Virtus London 14 3.5 km · 12 MW
- CyrusOne London 2 3.8 km · 11 MW
- Virtus London7 4.3 km · 19 MW
- Kao Data KLON-05 4.5 km · 14 MW
More Colt Data Centre Services data centers