UBS Data Centre
UBS Data Centre is an operational data center operated by UBS in Hayes, United Kingdom. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | UBS |
| Facility power | 12 MW (range 5.9 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,750 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Clayton Road 151, Hayes |
| Coordinates | 51.50677, -0.42715 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does UBS Data Centre use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How clean is the power for UBS Data Centre?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates UBS Data Centre?
UBS.
Data centers near Hayes
- Rackspace London 8 613 m · 4.9 MW
- Virtus London 14 1.2 km · 12 MW
- Data center in Hayes 1.3 km · 5.1 MW
- CyrusOne London 2 1.5 km · 11 MW
- VIRTUS LONDON2 1.9 km · 8.6 MW
- Virtus London7 2.1 km · 19 MW
- Colt London 4 2.3 km · 7.1 MW
- Digital Realty London LHR17 3.6 km · 3.2 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.