CyrusOne London 2
CyrusOne London 2 is an operational data center operated by CyrusOne in West Drayton, United Kingdom. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 11 MW (range 5.3 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,836 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | VIRTUS LONDON5 (Stockley Park) · CyrusOne LON2 |
| Address | DC2 Prologis Park Heathrow, Stockley Road |
| Coordinates | 51.50373, -0.44782 |
| Website | cyrusone.com/locations/united-kingdom/london-two |
Power and grid
| Nearest high-voltage substation | North Hyde Substation, 275 kV, 2.6 km away (National Grid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 10 |
| Power plants within 50 km | 2.5 GW in 85 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne London 2 use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How close is CyrusOne London 2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is North Hyde Substation (275 kV), about 2.6 km away.
How clean is the power for CyrusOne London 2?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates CyrusOne London 2?
CyrusOne.
Data centers near West Drayton
- Virtus London 14 281 m · 12 MW
- Virtus London7 1.0 km · 19 MW
- Rackspace London 8 1.3 km · 4.9 MW
- UBS Data Centre 1.5 km · 12 MW
- Digital Realty London LHR17 2.5 km · 3.2 MW
- Data center in Hayes 2.6 km · 5.1 MW
- VIRTUS LONDON2 3.1 km · 8.6 MW
- British Telecom Computer Centre 3.2 km · 7.2 MW
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.