CyrusOne London 2 is an operational data center operated by CyrusOne in West Drayton, United Kingdom. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power11 MW (range 5.3 MW to 17 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,836 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asVIRTUS LONDON5 (Stockley Park) · CyrusOne LON2
AddressDC2 Prologis Park Heathrow, Stockley Road
Coordinates51.50373, -0.44782
Websitecyrusone.com/locations/united-kingdom/london-two

Power and grid

Nearest high-voltage substationNorth Hyde Substation, 275 kV, 2.6 km away (National Grid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km10
Power plants within 50 km2.5 GW in 85 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.9 °C (2001 to 2025)
Cooling degree days53 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne London 2 use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is CyrusOne London 2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is North Hyde Substation (275 kV), about 2.6 km away.

How clean is the power for CyrusOne London 2?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates CyrusOne London 2?

CyrusOne.

Data centers near West Drayton

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.