Data center in Hayes is a data center under construction in Hayes, United Kingdom. Our footprint estimate of its power is about 5.1 MW.

Key facts

StatusUnder construction
Facility power5.1 MW (range 2.1 MW to 13 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 42,807 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 2,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.50166, -0.41019

Power and grid

Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.9 °C (2001 to 2025)
Cooling degree days53 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Hayes use?

We estimate the facility power at about 5.1 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Hayes?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Data centers near Hayes