Khazna Data Centers - IRIS (1-7)
Khazna Data Centers - IRIS (1-7) is an operational data center operated by Khazna Data Centers in Kizad, United Arab Emirates. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Khazna Data Centers |
| Address | Khalifa Industrial |
| Coordinates | 24.71183, 54.87614 |
| Website | khazna.ae |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 220 kV, 5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 32 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 470 g CO₂ per kWh (United Arab Emirates, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 68%, nuclear 21.2%, solar 9.9%. Clean power: 31.6% |
Climate and water
| Average temperature | 28.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 49.1 °C (2001 to 2025) |
| Cooling degree days | 4,105 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 6.02 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Extremely High (>80%) (Abu Dhabi) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Khazna Data Centers - IRIS (1-7) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (220 kV), about 5 km away.
How clean is the power for Khazna Data Centers - IRIS (1-7)?
The grid in United Arab Emirates emits about 470 g CO₂ per kWh (2025). Largest sources: gas 68%, nuclear 21.2%, solar 9.9%.
Who operates Khazna Data Centers - IRIS (1-7)?
Khazna Data Centers.
Data centers near Kizad
- Amazon Web Services 13.6 km · 20 MW
- Amazon Web Services 31.0 km · 18 MW
- Khazna Data Centers Apollo (1 - 6) 31.8 km
- Khazna Data Center - AUH 6 41.2 km
- Equinix Abu Dhabi AD1 41.5 km · 27 MW
- Khazna Data Center – Abu Dhabi 41.5 km
- Khazna Data Centers 42.8 km · 16 MW
- Data center in Jebel Ali 42.9 km · 25 MW
More Khazna Data Centers data centers
- Khazna Data Centers United Arab Emirates
- Khazna Data Centers United Arab Emirates
- Khazna Data Center - AUH 6 United Arab Emirates
- Khazna Data Center - Ibn Battuta - DXB8 United Arab Emirates
- Khazna Data Center – Abu Dhabi United Arab Emirates
- Khazna Data Center – Dubai United Arab Emirates
- Khazna Data Centers Apollo (1 - 6) United Arab Emirates
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.