Data Center Directory

Equinix Abu Dhabi AD1

Equinix Abu Dhabi AD1 is an operational data center operated by Equinix in Khalifah A City, United Arab Emirates. Our footprint estimate of its power is about 27 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power27 MW (range 14 MW to 44 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 22,789 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 12,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates24.41893, 54.62231

Power and grid

Nearest high-voltage substationMahawi substation, 220 kV, 8.4 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km2
Power plants within 50 km12 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity470 g CO₂ per kWh (United Arab Emirates, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 68%, nuclear 21.2%, solar 9.9%. Clean power: 31.6%

Climate and water

Average temperature28.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44 °C (2001 to 2025)
Cooling degree days3,739 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.88 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (Abu Dhabi)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix Abu Dhabi AD1 use?

We estimate the facility power at about 27 MW. Estimate from building footprint, low confidence.

How close is Equinix Abu Dhabi AD1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Mahawi substation (220 kV), about 8.4 km away.

How clean is the power for Equinix Abu Dhabi AD1?

The grid in United Arab Emirates emits about 470 g CO₂ per kWh (2025). Largest sources: gas 68%, nuclear 21.2%, solar 9.9%.

Who operates Equinix Abu Dhabi AD1?

Equinix.

Data centers near Khalifah A City

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.