Gulf Data Hub ICAD 1 is an operational data center operated by Gulf Data Hub in Musaffah, United Arab Emirates. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
OperatorGulf Data Hub
Facility power13 MW (range 6.3 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,578 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asGulf Data Hub ICAD 2
Coordinates24.26464, 54.45887

Power and grid

Nearest high-voltage substationIndustrial City of Abu Dhabi substation, 400 kV, 3.4 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km3
Power plants within 50 km4.3 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity470 g CO₂ per kWh (United Arab Emirates, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 68%, nuclear 21.2%, solar 9.9%. Clean power: 31.6%

Climate and water

Average temperature28.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44 °C (2001 to 2025)
Cooling degree days3,739 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.88 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (Abu Dhabi)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Gulf Data Hub ICAD 1 use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is Gulf Data Hub ICAD 1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Industrial City of Abu Dhabi substation (400 kV), about 3.4 km away.

How clean is the power for Gulf Data Hub ICAD 1?

The grid in United Arab Emirates emits about 470 g CO₂ per kWh (2025). Largest sources: gas 68%, nuclear 21.2%, solar 9.9%.

Who operates Gulf Data Hub ICAD 1?

Gulf Data Hub.

Data centers near Musaffah

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.