Stargate UAE Abu Dhabi
Stargate UAE Abu Dhabi is an operational data center in Musaffah, United Arab Emirates. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| AI chips | NVIDIA GPUs Guess from the operator, not confirmed. Frontier labs train on NVIDIA GPUs (Anthropic also uses TPU and Trainium). |
| Coordinates | 24.14764, 54.46220 |
Power and grid
| Nearest high-voltage substation | Dhafrah substation, 400 kV, 4.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 4.3 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 470 g CO₂ per kWh (United Arab Emirates, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 68%, nuclear 21.2%, solar 9.9%. Clean power: 31.6% |
Climate and water
| Average temperature | 28.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 48.5 °C (2001 to 2025) |
| Cooling degree days | 4,101 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.88 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | Extremely High (>80%) (Abu Dhabi) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Stargate UAE Abu Dhabi use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs.
How close is Stargate UAE Abu Dhabi to the power grid?
The nearest high-voltage substation in OpenStreetMap is Dhafrah substation (400 kV), about 4.4 km away.
How clean is the power for Stargate UAE Abu Dhabi?
The grid in United Arab Emirates emits about 470 g CO₂ per kWh (2025). Largest sources: gas 68%, nuclear 21.2%, solar 9.9%.
Data centers near Musaffah
- Stargate AI DataCenter 1.7 km
- Gulf Data Hub ICAD 1 13.0 km · 13 MW
- Amazon Web Services 13.5 km · 19 MW
- Khazna Data Center – Abu Dhabi 34.2 km
- Equinix Abu Dhabi AD1 34.3 km · 27 MW
- Khazna Data Center - AUH 6 34.5 km
- G42 Artemis 35.1 km · 1.2 MW
- Core42 SuperPOD 39.0 km · 1.8 MW
Sources
Correct this page or get the data