Kyndryl Data Center
Kyndryl Data Center is an operational data center operated by Kyndryl Deutschland in Oberursel (Taunus), Germany. Our footprint estimate of its power is about 1.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Kyndryl Deutschland |
| Facility power | 1.7 MW (range 0.8 MW to 2.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,396 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 730 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Gablonzer Straße 34, 61440, Oberursel (Taunus) |
| Coordinates | 50.19253, 8.59229 |
Power and grid
| Nearest high-voltage substation | Umspannwerk Bommersheim, 110 kV, 1.1 km away (RWE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Frankfurt Nord, 220 kV, 10.8 km away |
| HV substations within 10 km | 13 |
| Power plants within 50 km | 3.1 GW in 46 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 233 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Kyndryl Data Center use?
We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.
How close is Kyndryl Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Bommersheim (110 kV), about 1.1 km away.
How clean is the power for Kyndryl Data Center?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Kyndryl Data Center?
Kyndryl Deutschland.
Data centers near Oberursel (Taunus)
- Keppel Data Centres | Keppel DC Frankfurt 1 3.4 km
- Iron Mountain Data Center - Frankfurt (FRA-2) 3.4 km
- Maincubes FRA02 5.3 km · 7.6 MW
- noris network FRA1 5.4 km · 2.3 MW
- nLighten Frankfurt FRA1 5.9 km
- Kyndryl Deutschland data center in Eschborn 6.1 km · 1.3 MW
- CyrusOne Frankfurt 4 6.9 km · 6.3 MW
- Global Switch Frankfurt 7.0 km · 2.6 MW
More Kyndryl Deutschland data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.