Kyndryl Deutschland data center in Eschborn
Kyndryl Deutschland data center in Eschborn is an operational data center operated by Kyndryl Deutschland in Eschborn, Germany. Our footprint estimate of its power is about 1.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Kyndryl Deutschland |
| Facility power | 1.3 MW (range 0.6 MW to 2.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,074 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 560 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Kyndryl Data Center |
| Coordinates | 50.14443, 8.55257 |
Power and grid
| Nearest high-voltage substation | Westerbach, 110 kV, 1.9 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Farbwerke Höchst Süd (FWH-S), 220 kV, 7.5 km away |
| HV substations within 10 km | 30 |
| Power plants within 50 km | 3.3 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 233 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Kyndryl Deutschland data center in Eschborn use?
We estimate the facility power at about 1.3 MW. Estimate from building footprint, low confidence.
How close is Kyndryl Deutschland data center in Eschborn to the power grid?
The nearest high-voltage substation in OpenStreetMap is Westerbach (110 kV), about 1.9 km away.
How clean is the power for Kyndryl Deutschland data center in Eschborn?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Kyndryl Deutschland data center in Eschborn?
Kyndryl Deutschland.
Data centers near Eschborn
- nLighten Frankfurt FRA1 349 m
- CyrusOne Frankfurt 4 2.2 km · 6.3 MW
- CyrusOne FRA3 2.5 km · 67 MW
- noris network FRA1 2.5 km · 2.3 MW
- Maincubes FRA02 2.8 km · 7.6 MW
- CyrusOne Frankfurt 1 2.8 km · 5.9 MW
- MK Netzdienste Datacenter 2.9 km · 1.2 MW
- Digital Realty Frankfurt FRA29-32 3.0 km · 3.3 MW
More Kyndryl Deutschland data centers
- Kyndryl Data Center Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.