La Pointe 1
La Pointe 1 is an operational data center operated by Worldline in Noyelles-lès-Seclin, France. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Worldline |
| Facility power | 13 MW (range 6.5 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,896 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rue de la Pointe 23, 59139, Noyelles-lès-Seclin |
| Coordinates | 50.56681, 3.02838 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 225 kV, 2.9 km away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Power plants within 50 km | 1.0 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 67 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.11 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | High (40-80%) (Hauts-de-France) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does La Pointe 1 use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is La Pointe 1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (225 kV), about 2.9 km away.
How clean is the power for La Pointe 1?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates La Pointe 1?
Worldline.
Data centers near Noyelles-lès-Seclin
- Datacenter IBM 246 m · 4.9 MW
- Worldline Dassault 841 m · 3.9 MW
- Bouygues Télécom data center in Loos 5.2 km · 0.8 MW
- Oxya Datacenter 5.6 km · 2.5 MW
- UltraEdge Lille 6.8 km
- EXA Edge DC Sequedin 7.0 km
- Comarch France #1 7.5 km
- Comarch Data Center 7.5 km · 3 MW
More Worldline data centers
- Worldline Dassault France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.