LCRDC - King Edward
LCRDC - King Edward is an operational data center operated by Baltic Broadband in Liverpool, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Baltic Broadband |
| Networks | 2 networks PeeringDB. |
| Address | Liverpool City Region Data Centres, King Edward Industrial Estate |
| Coordinates | 53.41174, -2.99857 |
| Website | lcrdc.co.uk/liverpool-city-king-edward |
Power and grid
| Nearest high-voltage substation | Burlington Street Substation, 132 kV, 800 m away (Scottish Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Lister Drive Greener Grid Park, 275 kV, 4.9 km away |
| HV substations within 10 km | 19 |
| Power plants within 50 km | 4.9 GW in 80 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 26.1 °C (2001 to 2025) |
| Cooling degree days | 5 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.75 kWh per m² per day |
| Wind at 50 m | 7.5 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is LCRDC - King Edward to the power grid?
The nearest high-voltage substation in OpenStreetMap is Burlington Street Substation (132 kV), about 800 m away.
How clean is the power for LCRDC - King Edward?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates LCRDC - King Edward?
Baltic Broadband.
Data centers near Liverpool
- DC02 - The Tapestry 1.8 km
- DC01 -Baltic Creative 2.2 km
- ARO DC2 Kilby House (AIMES) 4.3 km
- nLighten Liverpool LPL1 7.8 km · 2.4 MW
- nLighten Chester MAN1 18.9 km
- nLighten Chester 19.1 km · 9.5 MW
- Getronics, The Babbage Centre 20.1 km
- The Babbage Centre 20.2 km · 4 MW