nLighten Chester MAN1
nLighten Chester MAN1 is an operational data center operated by nLighten HQ in Chester, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | nLighten HQ |
| Networks | 2 networks PeeringDB. |
| Address | Dunkirk Trading estate, Chester Gates |
| Coordinates | 53.24582, -2.93505 |
| Website | nlighten.com/en/united-kingdom-data-centers/chester |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 400 kV, 2.5 km away (National Grid Electricity Transmission) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 23 |
| Power plants within 50 km | 4.6 GW in 72 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 27.6 °C (2001 to 2025) |
| Cooling degree days | 6 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.75 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is nLighten Chester MAN1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (400 kV), about 2.5 km away.
How clean is the power for nLighten Chester MAN1?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates nLighten Chester MAN1?
nLighten HQ.
Data centers near Chester
- nLighten Chester 372 m · 9.5 MW
- nLighten Liverpool LPL1 11.1 km · 2.4 MW
- The Babbage Centre 15.9 km · 4 MW
- Getronics, The Babbage Centre 16.0 km
- DC01 -Baltic Creative 16.9 km
- ARO DC2 Kilby House (AIMES) 18.1 km
- DC02 - The Tapestry 18.5 km
- LCRDC - King Edward 18.9 km
More nLighten HQ data centers
- nLighten Swindon BRS2 United Kingdom
- nLighten Leeds LBA1 United Kingdom
- nLighten Strasbourg SXB1 France
- nLighten Besancon MLH1 France
- nLighten Liverpool LPL1 United Kingdom
- nLighten Paris PAR2 France
- nLighten Sophia Antipolis NCE1 France
- nLighten Paris PAR1 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.